Pinedale
on the Web! |
Pinedale Online > News > September 2009 > Update on the Pinedale Anticline > Drilling |
Back to Article © Photo by Dawn Ballou, Pinedale Online |
Once drilling is completed, the drill rig goes away. In 2005, one straight-down wellpad took more than 8 acres. Today, with directional drilling, dozens of wells can be clustered onto a single wellpad, significantly reducing the surface disturbance per acre taken by each well. |
Copyright © 2009 Pinedale Online. All rights reserved. |